Design features
motor-operated isolation with torque and limit protection for remote power-plant control

Final dimensions, materials, ratings and documentation depend on the approved configuration.
Power station valves / LIANGGU
This model is a gate valve distinguished by motor-operated isolation with torque and limit protection for remote power-plant control. For a project quotation, share the required size, pressure designation, materials, seating, connections and quantity. Final suitability is confirmed against the approved specification.
PRODUCT DETAILS
motor-operated isolation with torque and limit protection for remote power-plant control
a stem moves a wedge or parallel gate clear of the bore for isolation; the valve should normally be fully open or fully closed, not used as a routine throttling device; verify closing time and power supply
boiler systems, turbine auxiliaries, high-energy piping, and interlocked isolation points
actuator duty, closing time, power supply, torque margin, stem thrust, control signals, and emergency operation
SPECIFICATION REVIEW
Manufacturer-listed options remain subject to the selected design and service. They are not fixed specifications for every configuration.
| Size / DN or NPS | Project-specific — include in your RFQ |
|---|---|
| Pressure designation | Project-specific — include in your RFQ |
| Common material options | Manufacturer optionCarbon, low-alloy, or stainless steel selected from the approved pressure-temperature basis, thermal cycling, weldability, and plant material specification |
| End connection & standard | Manufacturer optionButt-welded, socket-welded, threaded, or flanged ends only within the selected product design and piping-class scope |
| Actuation & accessories | Manufacturer optionElectric actuator; torque and limit settings, duty cycle, power supply, controls, feedback, and manual override must be specified |
| Design standards | Manufacturer optionASME B16.34 and the power-plant specification form the pressure-design basis; API 600 or API 602 may apply only when the selected construction falls within scope |
| Lead time & documentation | Confirmed in the written quotation |
Listed materials are common options, not an exhaustive range. Share the required grade and service conditions so we can review suitability, manufacturing feasibility and availability.
Catalogue information supports the enquiry. Approved technical documents define the final supply.