Published manufacturing and inspection capabilities
The manufacturer describes CNC machining, welding and assembly facilities, alongside non-destructive inspection and material analysis. Its published equipment list includes pressure testing and facilities for selected high-temperature, cryogenic, fugitive-emission and safety-valve tests.
The inspection and test plan for your order defines the applicable methods, acceptance criteria and records.
Manufacturing & quality review
Lianggu Valve Group manufacturing facilities.
Agree the evidence before manufacture
Identification and traceability
Confirm valve tags, model and serial numbers, material heat references, nameplate information and the material documentation required by the purchase specification.
Inspection and testing
Specify the test standard and edition, acceptance criteria, test medium, pressure, duration, inspection points and witness requirements.
Documentation and release
Agree the drawings, inspection and test plan, reports, certificates, preservation, packing and release documents required for the order. Availability and scope are confirmed in the written offer.
Certification is scope-specific
A management-system certificate, a laboratory accreditation, a product licence and a type-test report prove different things. The required document must match the selected product, manufacturing site and service.
Review qualification references → · Include quality requirements in an RFQ →
Review the manufacturer in person
For a sourcing programme or supplier review, we can coordinate a manufacturer visit around your technical priorities and qualification checklist.



