Candidate valve configurations
Power station isolation, non-return and control configurations.
The final model, construction and material combination must be checked against the project specification.
Include these conditions in your enquiry
Design and operating conditions; cycling and thermal transients; material class; pressure-seal requirements; welding ends and inspection scope.
Review supporting material
Prepare the next step
Send quantities, tag numbers, the project location, required delivery date and document list. Identify any owner-approved vendor list or tender deadline.
